HDI PCB Microvia Stackup RFQ Checklist: What OEM Buyers Must Specify Before Fabrication

A request for quotation that says only “six-layer HDI PCB” is rarely enough for a reliable manufacturing quotation. Two boards with the same layer count can require very different lamination cycles, drilling processes, inspection plans and yields. Procurement teams can reduce clarification rounds by specifying the stackup, microvia construction, materials, electrical requirements and acceptance criteria before comparing prices. This guide focuses on the information a hardware OEM should provide, not on promising that one particular factory can manufacture every configuration.

1. Define the product and manufacturing scope
Begin with the finished board's purpose: prototype validation, pilot production or volume manufacturing. State whether the supplier is quoting bare printed circuit boards, assembly, testing or a complete electronic product. Include estimated annual usage, order quantities, panelization preferences and delivery location. A prototype price should not be assumed to represent a stable volume price because engineering setup, panel utilization and test coverage differ. Identify whether the design is fixed or still open to manufacturability changes.
2. Supply the complete layer stackup
Specify copper and dielectric layers in order, target finished thickness, finished copper thickness where critical, reference planes, dielectric material families and any controlled-impedance traces. Do not simply state a core thickness without explaining the build-up layers. Provide an editable stackup drawing or table, including the intended signal return paths. Ask the fabricator to propose manufacturable dielectric thicknesses and confirm that the final stackup will be approved before production. Electrical simulation values depend on the actual material properties and geometry.
For fine-pitch components, the board designer should confirm that pad escape routing is feasible with the proposed trace width, spacing and via arrangement. Manufacturing capability must be validated against the selected supplier's current process limits, not against generic online charts.
3. Describe each microvia structure explicitly
A microvia is not just a small hole. Indicate which adjacent layers each laser-drilled via connects, whether the design uses staggered or stacked microvias, and whether copper-filled vias are required. Identify via-in-pad locations, buried vias, mechanical through-holes and any sequential lamination cycles implied by the architecture. Provide finished hole or capture-pad dimensions only where the design requires them, and ask the supplier to confirm achievable geometry and registration tolerance.
Stacked microvias may impose different reliability and process-control challenges from staggered arrangements. The decision should consider board thickness, component pitch, routing density, thermal cycling and the manufacturer's proven process. Avoid making a design change based only on a quoted price difference; a redesign can affect assembly and signal integrity.
4. Separate design intent from acceptance criteria

An RFQ should distinguish required design geometry from measurable acceptance conditions. Include trace width and spacing, annular ring requirements, solder mask registration, surface finish, copper plating requirements, bow and twist limits where relevant, and final electrical test expectations. Where an IPC specification or class is required, state the exact document, revision and class agreed with the customer. An IPC document reference alone is not evidence that a particular manufacturer or product holds an independent certification.
For mission-critical electronics, the buyer should define additional qualification and documentation requirements with the design authority. Do not treat a generic inspection report as proof of application-specific reliability. Specify the required records and sampling plan during quotation rather than after the first shipment.
5. Provide impedance and signal-integrity inputs
If controlled impedance is required, list each net class or representative structure, target impedance, tolerance, reference layers and intended routing geometry. Clarify whether values refer to single-ended or differential signals. A fabricator can recommend manufacturable dimensions, but the design team remains responsible for validating the electrical system. Ask whether test coupons and impedance measurement reports are included in the quote, and identify the applicable measurement method.
For high-speed interfaces, material loss, roughness and return-path continuity may matter as much as nominal impedance. Discuss these at the engineering stage, especially if a proposed material substitution changes dielectric properties. Do not approve substitutions solely because the nominal laminate thickness matches.
6. Clarify materials, surface finish and environmental constraints
Specify the laminate family, relevant glass-transition and thermal requirements, lead-free assembly profile where known, surface finish, solder mask color only if essential, and any special cleanliness or storage conditions. If the application requires halogen-free materials or specific regulatory documentation, state the exact requirement. Ask the supplier to identify material availability and acceptable alternatives in writing. Material selection should reflect actual assembly cycles and operating conditions rather than marketing labels.
7. Include fabrication data and revision control
Supply the manufacturing outputs agreed with the supplier, such as Gerber or ODB++ data, NC drill files, fabrication drawing, netlist and stackup notes. Clearly identify the revision, units and approved deviations. Define how engineering questions are recorded and who can approve a change. Incomplete drill maps, ambiguous plated versus non-plated holes, and inconsistent drawing notes can delay quotation or cause avoidable fabrication errors. Maintain a controlled data package so prototype lessons transfer into production.
8. Ask the supplier about verification and traceability
Request a process review that identifies critical features, inspection stages and known design risks. Discuss electrical continuity testing, microsection evaluation where appropriate, microvia quality controls, final dimensional inspection and lot traceability. The exact inspection plan should follow the application and agreed purchase specification. Ask which results will be provided with each shipment, which will be retained by the manufacturer and how nonconformities are reported.
Reliability testing is especially important when the product faces repeated thermal cycling or harsh service conditions. Agree on any required qualification method and acceptance criteria before the order. A supplier's general capability statement is not a substitute for evidence from the actual board design and manufacturing route.
9. Compare quotations on equal technical terms
Build a comparison sheet that records the same layer stackup, microvia architecture, material grade, finished dimensions, quantity, electrical test scope, inspection documents, tooling charges and lead time for every bidder. Mark each deviation explicitly. A lower quote may reflect a different surface finish, test coverage, material substitution or panel yield assumption. Ask suppliers to separate nonrecurring engineering charges from unit pricing and identify which parameters most affect cost.
For a complex HDI design, an engineering review before the purchase order may be more valuable than requesting an immediate fixed price. Agree on the final manufacturing data package, revision and change approval route before production release.
10. Copy this information into your next HDI PCB RFQ
Include application and project phase; bare-board or assembly scope; annual and batch quantities; board outline and thickness; complete layer stackup; material requirements; microvia layer pairs and stacked or staggered construction; via-in-pad and copper-fill requirements; minimum trace and spacing; impedance targets and test coupons; surface finish; applicable acceptance documents and revisions; inspection and traceability deliverables; fabrication data revision; delivery terms; and required quotation validity. Attach clear drawings rather than relying on descriptive email alone.
Discuss your PCB project with SCM Group
SCM Group supports customers evaluating HDI PCB sourcing and electronics manufacturing requirements. Send your fabrication drawing, stackup, quantities, application and technical questions through https://www.scmgroup.online/ so the team can review the project and discuss suitable manufacturing options. Feasibility, pricing, lead time and any performance or certification requirements must be confirmed against the specific design and production partner.
Engineering note: This checklist is general procurement guidance. Final design, acceptance criteria, standards applicability and qualification remain the responsibility of the project engineering team and its approved manufacturers.